A bathroom renovation is a small room with a lot packed into it — plumbing, electrical, tile, ventilation, fixtures and storage, all in a space you use every day. That is why planning matters more here than in almost any other room. A bathroom planned properly is a smooth job; a bathroom decided on the fly is where surprises, delays and extra costs come from. We renovate bathrooms across Toronto, Mississauga, Oakville and Burlington, with 11 years of experience, licensed & insured with $2M liability. We are now booking bathroom projects for January 2027. You can see finished bathrooms on our bathroom page.
Before looking at tile or fixtures, decide what the renovation actually covers. Is this a full gut renovation — everything out, down to the studs — or a refresh of the surfaces? Is the layout staying, or is the shower, vanity or toilet moving? Moving plumbing changes the job completely: new drains and water lines, different permits and inspections, and a different budget. A layout that stays put is a faster, simpler renovation. Neither choice is wrong, but the scope has to be settled before anything else, because every decision after it depends on it.
A bathroom for a couple getting ready at the same time is a different room from a kids' bathroom, a guest bathroom or a powder room. Ask the practical questions first. How many people use it at once? Is there enough storage for towels, cleaning products and everyday items? Is the shower the priority, or would a tub get used? Where does the light fall, and is the ventilation working? The answers shape the layout, the vanity size, the shower size and the storage — and they are much cheaper to answer on paper than to fix after the tile is up.
This is the heart of our process, and the stage that decides whether a renovation goes smoothly. Layout, tile, fixtures, vanity, lighting, flooring and ventilation are all chosen before construction starts — not during it. You decide on the materials, the supplier and the price, with a designer guiding every choice: comparing options, checking what fits the layout, and helping you get the right materials at the right supplier for the right price. Our six-step process is site visit, rough estimate, design phase, exact estimate, contract and construction — and the design phase is where the project is really built, on paper, before a single wall comes down.
After the site visit you get a rough estimate range, so you know whether the project fits before anyone spends weeks on design. But the exact number only comes once every choice is made. A bathroom with a standard vanity and ceramic tile is a different job from one with a floating vanity, large-format porcelain and a frameless glass shower. When the price is based on decisions rather than allowances, there is nothing left to drift later. If something changes after the exact estimate, it is a change you approve, with its cost known up front.
Most homes in Toronto have more than one bathroom, but if the one being renovated is the only full bathroom, plan around it. A renovation means days when the shower, toilet or sink is out of use, and dust and noise through the house. Before construction starts, work out where everyone showers, where the kids get ready for school, and how the work area is kept separate from the rest of the home. A good contractor will talk through this with you before the contract is signed, not after demolition starts.
A bathroom touches every trade: demolition, plumbing, electrical, tile, drywall and paint. Each one is done by a specialist, and they need to work from the same plan, in the right order. The plumber roughs in before the tile setter arrives; the electrician wires the lighting and the fan before the drywall goes up; the vanity is measured against the finished tile, not the other way around. That coordination is the general contractor's job — Nacho and Milu organize and coordinate every project, and all trades are subcontracted to licensed specialists. When one contractor owns the schedule, the trades do not work from different plans and the job does not stall between stages.