How to Prepare for Flooring Installation

Flooring installation is one of the more disruptive parts of a renovation, but it is also one of the most predictable — if the rooms are ready when the crew arrives. Most delays and extra costs come from surprises on the day: furniture still in the room, no clear access, or a subfloor problem nobody saw. A little preparation saves time, money and frustration. Here is what to do before installation day.

Clear the Rooms — Completely

The rooms being floored need to be empty: furniture, rugs, electronics, books, plants, everything off the floor and out of the way. The crew needs clear space to work, to stage materials and to move without carrying planks around a sofa. If you cannot move heavy furniture yourself, tell us at the site visit — moving furniture is something to plan for, not something to improvise on the morning of the job. Closets in the rooms being floored should be emptied too, since the floor runs under them.

Plan Access and Parking

The crew will be carrying boxes of flooring, tools and equipment in and out, so a clear path from the truck to the rooms matters — especially in winter, when a driveway full of snow slows everything down. If parking is tight, or if the building has rules about deliveries and elevators, let us know in advance. The materials also need a dry place to sit before installation, ideally inside the house, so they are at the same temperature and humidity as the rooms they are going into.

Expect Dust, Noise and a House in Transition

Flooring work is noisy and dusty, even when it is just a floating floor. Removing an old floor creates the most dust, and cutting planks creates more. Doors can be closed to contain it, and the crew will clean up, but if you work from home, plan to be elsewhere or in a room far from the work. Pets should be kept away from the work area — for their safety and for the crew's — and kids should know the rooms are off-limits while tools are out.

The Order of Work Matters

Flooring usually goes in after the messy trades are done and before the final finishing touches. In a full renovation, that means after demolition, plumbing, electrical and drywall, and before the final paint touch-ups and baseboards in some cases. If you are renovating a kitchen or bathroom at the same time, the floor and the cabinets need to be sequenced properly — which is why the order of work is planned in the design phase, not decided on the day. Ask us about the sequence for your project and we will walk you through it.

Baseboards, Doors and Transitions

New flooring is often slightly thicker or thinner than the old one, which affects baseboards, door clearances and the transitions to neighbouring rooms. Baseboards may need to come off and go back on, or be replaced; doors may need trimming to swing over the new floor. These are small jobs, but they are part of the plan — they should be discussed before installation, not discovered when a door will not close. The same goes for transitions: how the new floor meets the old one at each doorway should be decided in advance.

The Day Itself

On installation day, the crew will confirm the layout with you — which direction the planks run, where the cuts fall, where the transitions go — before the first plank is laid. Then it is a steady rhythm of laying, cutting and fitting, with a walkthrough at the end: how the floor looks, how the transitions feel, and anything that still needs a touch-up. Our process is six stages: site visit, rough estimate, design phase, exact estimate, contract, then construction. We install flooring across Toronto, Mississauga, Oakville and Burlington, with 11 years of experience, licensed & insured with $2M liability. See our flooring page.