In a kitchen renovation, painting comes near the end — after the drywall, after the cabinets, after the tile — and it is the trade that makes everything else look finished. A kitchen is also the hardest room in a house to paint well: it has grease, steam, heat, and more surfaces to protect than any other room. Here is how the painting stage of a kitchen renovation works. We are a general contractor serving Toronto, Mississauga, Oakville and Burlington, with 11 years of experience, licensed & insured with $2M liability. Nacho and Milu organize and coordinate every project, and all trades are done by licensed specialists. You can see finished kitchens on our kitchen page.
The walls and the ceiling are the main surfaces, along with the trim: baseboards, door casing, window trim and any crown moulding. The walls are painted in a finish that can be wiped clean — kitchens get splashed, and a flat wall paint will mark the first time something hits it. The trim is painted in a harder finish, usually satin, so it can be cleaned without losing its sheen.
The colours are decided in the design phase, with the cabinets, the countertops, the backsplash and the flooring, so the paint works with the kitchen rather than against it. A kitchen decided on paper, before construction, is a kitchen where the paint colour already suits the cabinets on the day they are installed.
Painting a kitchen is as much about protection as it is about painting. New cabinets are masked and covered before any paint goes near them. Countertops are protected, because a drop of paint on stone or quartz is a problem that does not wipe off easily. Appliances are covered, floors are protected, and the backsplash tile is masked along its edges so the paint line is crisp.
This is where the order of a renovation matters. Painting happens after the cabinets and the tile are in, but the protection is planned from the start: the painters work in a kitchen where the finished surfaces are already covered, and nothing is painted until the things that should stay clean are safe.
The sequence in a kitchen renovation is: drywall and taping first, then priming, then the cabinets and tile, then the painting. Walls are primed after the drywall is finished, so the paint has a sound surface. The final coats go on after the cabinets are installed, because the paint has to meet the cabinets cleanly — and because a cabinet installed against a finished wall will mark it.
Touch-ups come last, after the fixtures, the handles and the appliances are in. A kitchen is not finished when the paint is dry; it is finished when the last touch-up is done and the walkthrough happens — the final check where anything that still needs attention is caught.
A kitchen wall lives a harder life than a bedroom wall. Steam from cooking, grease near the stove, splashes near the sink, heat from the oven — all of it works on the paint. That is why preparation matters more here: the walls are cleaned before painting, because paint does not bond to grease, and the right finish is chosen, because a kitchen wall has to be washable.
Ventilation matters too. A kitchen that is painted while the range hood is not yet working, or while the room is sealed up, will dry slowly and unevenly. The painters work with the ventilation the kitchen will actually have, and the room is left to dry properly between coats.
Painting is never a standalone job in our kitchen renovations — it is one trade among many, done by licensed specialists and coordinated by us with the cabinets, the tile, the electrical and the plumbing. That coordination is the point of hiring a general contractor: the painter knows when the cabinets are in, the cabinet installer knows when the walls will be painted, and nobody is working from a different plan.
We are now booking kitchen, bathroom and full-home projects for January 2027. If you are planning a kitchen renovation, the painting is decided in the design phase, with everything else — and finished as part of the room, not added on afterwards.
Message us on WhatsApp at (416) 706-3577 for a free kitchen renovation quote
Tell us about your kitchen — the layout, what works and what does not — and we will walk you through the six stages. Now booking January 2027.