A staircase renovation changes the most used route in your house, so it helps to know what is coming before the work starts. The job follows a clear order, and each stage has a purpose. Knowing what happens at each stage — and what daily life looks like while the work runs — takes most of the stress out of the project.
At Nacho Solutions, every project follows the same six-step process: site visit, rough estimate, design phase, exact estimate, contract, then construction. We renovate staircases across Toronto, Mississauga, Oakville and Burlington, with 11 years of experience, licensed & insured with $2M liability. Here is what to expect, stage by stage.
It starts at your staircase, not on the phone. We measure the treads and risers, walk the stairs, check the condition of the structure, the railings and the guardrail, and look at how the staircase meets the floors at the top and the bottom. We also talk about what bothers you about the stairs now, and what you want them to look like when the job is done.
This is also the stage where we tell you honestly whether capping is the right job. If the structure is damaged or unsafe, that is structural work, and we will say so rather than sell you a renovation that hides a structural problem.
After the visit, you get a rough estimate range — a realistic bracket, not a final price. The point is that you know whether the project fits before anyone spends time on design. A complete one-floor staircase renovation — 13 to 15 steps, tread and riser, handrail, iron pickets and guardrail — is around CAD $4,999–$7,000, but every staircase is different, so the range for your staircase comes from the visit, not from a website.
This is where the decisions happen: the tread wood and stain, the risers, the handrail, the iron pickets, the guardrail, and how the staircase will match the floors. Everything is chosen here, before construction, so nothing is improvised on site and nothing is reordered halfway through. The design phase is the stage that decides whether the renovation goes smoothly.
Once every choice is made, the rough range becomes an exact estimate: same scope, same materials, one number. Then the scope, the materials, the schedule and the payment terms go into a written contract, and everyone signs the same document. If it is not in the contract, it is not in the job — which is why the design phase matters so much.
Then the build. The old surface and railings come off, the new treads and risers go on, and the new handrail, iron pickets and guardrail are fitted. Each trade is done by a specialist, coordinated by us, with Nacho on site every day until it is done.
While the work runs, the stairs are out of use. That is the part of the project that affects daily life the most, so plan for it before the work starts. If the bedrooms are upstairs and the kitchen is downstairs, work out how the household will manage while the staircase is closed, and make sure everyone knows the plan. Ask us, before construction begins, how the job is sequenced and what access you will have day by day — a job that has been planned properly has an answer to that question.
A staircase renovation makes dust and noise. The staircase runs through the middle of the house, so the work is not tucked away in a back room. Expect tradespeople coming and going, tools running during the day, and dust that travels further than you expect. Clearing the area around the staircase before the work starts — shoes, coats, furniture, anything stored under or beside the stairs — makes the job faster and keeps your belongings clean.
The job ends with a walkthrough: how everything works, what to look after, and anything that still needs a touch-up. You can see finished staircases on our stairs page, and stairs have availability now, while kitchens, bathrooms and full-home projects are booked until January 2027.